New home decoration is usually not an easy task. There are many things that require labor and effort. Meeting the new door and getting it right is the first problem that is often faced by a new home. But how much do you know about the installation of the door? What do you need to pay attention to? Do you not know? Here is the knowledge for everyone.
In order to ensure that the function of the wooden door is well played, the installation of the wooden door needs to pay attention to some problems. First of all, the goods should be placed horizontally on the ground, do not lean; the unpainted products should be fully sealed within 4 hours after unpacking, and painted within five days; whether before installation, due to size measurement Mistaken wooden doors need to be trimmed, or products that need to be trimmed during slight cracking, shrinkage, and deformation during use must be disposed of or agreed by the dealer. Otherwise, the dealer and the factory will not bear any guarantee responsibility; Time exposure, to prevent the wooden door from being heated; pay attention to keep the indoor air circulation, prevent the wooden door from being constantly damp; also prevent the wooden door from being subjected to abnormal impact, and should not use excessive force when switching. In addition, it is strictly forbidden to nail heavy objects on the door. Otherwise you are in the door of chronic murder of your home. Also, those hardware connectors, especially metal handles and locks, are as little as possible in contact with gas and acidic, alkaline objects such as corrosive metallic luster, which are their nemesis, away from those that help keep the hardware shiny. There is still a small point. Please remember to unlock a bunch of keys when you unlock them, so as not to scratch the paint surface and damage the image of the door.
Do you know all about the wooden door installation process? When installing the wooden door, first check whether the components of the wooden door are complete, whether the dimensions of each component are correct, and whether the position of each set of doors to the corresponding installation is consistent with the size of the door opening.
1, assembly door cover
First find the door cover and the vertical plate. According to the back number, the joint should be on the same plane. Apply glue to the interface. Put the 80mm wood screw on the hole behind the interface and tighten it with a screwdriver. Do not put the screws directly into the entry sleeve, check whether the size between the nozzles is correct, whether the joints are flat and firm, and then install the iron on the back of the door panel. When installing the iron, use 25mm. Tapping screws, the spacing of the iron pieces is preferably 300-350mm, and the iron piece is 200mm away from the ground.
2, install the door cover
Put the assembled door cover into the door hole and fix the door cover with a small wooden strip. The two sides of the door cover should be on the same plane as the wall. Then check whether the whole door cover is perpendicular to the ground. Whether the two corners of the board are at right angles, whether the door panel is bent or not, and the iron pieces are twisted at both ends to wrap the wall. According to the position of the reserved hole on the iron piece, drill the 8mm hole on the wall with the electric hammer, plug it with a small wooden strip, fix the iron piece to the wall with 80mm wood screws, and then use the small wooden strip to fix the door cover and the wall. The gap between the bodies is filled tightly, and the door cover is re-checked for compliance with the door, and then the styrofoam is inserted.
3, install the door leaf
First open the hinge groove, the distance between the hinge groove and the door leaf is preferably 1/10 of the height of the door leaf, and the heavy door should be equipped with 3 hinges. The depth of the hinge groove is preferably the thickness of the hinge piece. To install the hinge, use the screw that matches the hinge. The screw should be tightened with a screwdriver. You can't use the hoe to drive the screw directly. After the hinge on the door is fixed, the hinge on the door cover should only be screwed first. Screw, then close the door to check whether the left and right gaps of the door are the same, whether the opening is flexible, and then confirm the correctness, then tighten the other screws.
4, install the door lock
According to the provided lock type, it is installed to the corresponding position. The height of the lock position is 900-1000mm from the ground. After installation, check whether the door leaf and door lock switch are flexible and whether the seam is in compliance with the specifications.
5, install the door line
According to the size of the installation site, cut the wire saw with right angle edge into a 45 degree bevel, trim it with a flat or woodworking planer, insert it into the door pocket at the right angle, and stick the door line to the door panel with the floor glue. At the 90-degree touch point, the bevel angle is uniform, flat, and the joint is tight. The joint of the door sleeve is glued firmly. At the two ends of the door sleeve, the corner nail is fixed with a small straight nail.
6. Install the door suction at the corresponding position.
Installing the door is the first step in the renovation of the new home. It must be stable. The installation of wooden doors requires careful attention and knowledge of the installation of wooden doors, so that you don't panic when you install them.
Document.body.oncopy = function () { setTimeout( function () { var text = clipboardData.getData("text"); if (text) { text = text + " This article comes from China Wooden Door Network, China's well-known wooden door industry portal Website! (http://) Detailed reference: "+location.href; clipboardData.setData("text", text); } }, 100) }Shoulder bag, crossbody bag, hand bag, mommy bag,Hiking bag,Thermal box
Dongguan Jinying Handbags Co.,Ltd , https://www.jinyingnicebag.com